Introduction
The council provides a number of services to support the development process.
How To Apply
Forms are available at the counter Engineering Department, 10th Floor, Elevator A
Guidelines
-
A completed fill out application form.
-
Application of permit for excavating and cabling.
-
Photograph of worksite.
-
Work plan schedule.
-
Location plan and site plan.
-
Utilities detection and mapping plan
-
Plan for traffic management
-
Other detail Plans
Terms and Conditions
-
Approval of this permit is valid for a period of one (1) month from the date of the approval letter. Extension of time period must be made one week before the expiry date of the approval. An extension of time period and permit fee take effect from the expiry date of the previous permit approval.
The location of the work to be performed must comply with the plans submitted in the application documents. Any change in location or route has to obtain prior written approval from the Council.
The working hours are as follows:
Project Signage, signage for standard traffic control and security lightings to alert road users about the work being carried out should be provided.
Clean roads and drains as well as good traffic flow should always be maintained.
The work of excavation should be implemented on phases, with a distance of not more than 60m for each phase.
Installation of pipes across existing drains is not allowed at all
Any accidents arising out of the above mentioned work is the responsibility of the applicant.
The applicant is required to repair the damage on the road curb by re-levelling the ground with top soil and planting grass including rebuilding drainage with the type of glaze ware if applicable.
Any damage on the property of the Council must be repaired. The letter of completion of work will not be issued if the applicant fails to repair the damage or if the quality of repair work is unsatisfactory.
For small excavation works, repairs should be done by cutting the road surface, removing and repaving with thickness of 50mm C14 including road lines.
The layers of road structures for road repair work shall consist of::
50mm thick of sand.
300mm thick of cruser run
65mm thick of binder course C20.
50mm thick of wearing course C14.
Permanent repair work by milling and paving based on the width of existing road shall be performed after the expiration of two (2) months using C14 50mm of thickness with the road lines.
Test for the thickness of the premix (coring test) will be performed by MBSA staff after the repair work is carried out on site permanently. The completion of work report will be put as an appendix together with the coring test form.
If the applicant fails to complete the work properly within the stipulated time, the Council will appoint a third party to carry out repair works and all costs incurred will be deducted from the security deposit submitted to the Council and the applicant is also required to pay any additional costs incurred if the cost of the work performed in excess of the amount of the security deposit.
Site visit with the Council shall be held after 'milling and paving' work is completed. This is to enable the confirmation letter to be issued for the completion of work.
Refund claims of deposit can only be made after the expiration of six (6) months of the confirmation letter of work completion.
Act / Enactment of Laws (Labour Law).
-
Local Government Act 1976 (Act 131).
-
The Street, Drainage and Building Act 1974 (Act 133).
-
Laws (Compounding of Offences) (MBSA) Road, Drainage and Building 2005
-
Laws – Road Work 1996.
-
Instruction Techniques (Road) JKR.
Rates
Permit Rates Fee and Deposit.
-
Close Permit Fee / Dig / Use of the road:
1.
|
RM 1.00 x length of Utility (m)
|
For each utility implemented
|
2.
|
RM 0:10 x length of utility (m2)
|
For each cable pulling without excavation.
|
-
Close Permit Fee / Digging / Use of the road:
1.
|
RM 30.00 x length x width of the road (m2)
|
For excavation work below the surface of the road.
|
2.
|
RM 2,000.00
|
For dredging work which does not exceed 20 meters
|
3.
|
RM 40.00 x length (m)
|
For dredging work on road pavement
|
4.
|
RM 1, 000.00
|
For each manhole planted.
|
5.
|
RM 2,000.00
|
For pulling cable less than 1km without dredging and additional RM 1000.00 per k / m second and subsequent
|
-
Excavation Permit Fee for 'Horizontal Directional Drilling' / Pipe Jacking:
Minimum RM 100.00
|
For each pit.
|
-
Deposit payments for Dredging Horizontal Directional Drilling / Pipe Jacking:
RM 5,000.00 |
For each pit implemented. |
-
Fees for Parking Permit of Building Materials:
Minimum RM 100.00
|
For the installation work of every 1km.
|
-
Fees for Parking Permit of Building Materials:
RM 5,000.00
|
For every RM 3,000.00 For excavation not exceeding 1000 meters and additional RM 2,000.00 for each second km onwards.
|
-
Fees for Parking Permit of Excavated Materials
Minimum RM 300.00
|
For every project.
|
-
Fees for Parking Permit of Excavated Materials
RM 3,000.00
|
For every project undertaken
|
-
Road Permit Fee:
Minimum RM 300.00
|
RM1 for every 10m2 storage area on roads and the like
|
-
Road Permit Fee:
Minimum
RM 5,000.00
|
For each project done Minimum RM5000.
RM5 per 1m2 road width reserved or part thereof.
|
-
Bridge Permit Fee:
Minimum RM 300.00
|
RM 25 per 9M2 wide of bridge or part thereof
|
-
Bridge Permit Fee:
Minimum RM5,000.00
|
RM5 for every 1m2 wide of bridge or part thereof
|
-
Retaining Wall Permit Fee:
Minimum RM 300.00
|
RM3 for every 9M2 wide of retaining walls or part thereof
|
-
Retaining Wall Permit Fee:
A Minimum of R M 5,000.00
|
RM5 for every1m2 wide of retaining walls or part thereof
|
-
Permit Fee for Drainage and Retention Pond:
Minimum RM 300.00
|
RM1 for every 10m2 wide of ditches, ponds, etc.
|
-
Permit Fees for Drainage and Retention Pond:
Minimum RM 5, 000.00
|
RM5 for every 1m2 wide of retaining walls or part thereof
|
-
Permit Fee for Drainage and Retention Pond:
RM60 for each amendment made to the approved plan.
|
- Exceptional deposits on the following structures:
- Mosque and Surau
- prayer houses – for non-muslims
- Government schools
- Public Hall
Download
-
Flowchart for Closed Permit Application / Excavation & Use of Road
-
Closed Permit Application Form / Excavation & Use of Road
Method Of Payment
-
Main Counter
Lift A, Level G, Wisma MBSA
|
-
Cash
-
Cheque
Payment by cheque made payable to:
-
MAJLIS BANDARAYA SHAH ALAM
for the bill payment process
-
MBSA – AKAUN
CAGARAN
for payment security
|
Contact
Engineering Department
Lift A, 10 floor, Wisma MBSA, Persiaran Perbandaran,
Section 14, 40000 Shah
Alam,
Selangor Darul Ehsan.
No. phone: 03-5510 5133 ext. 338
No. fax: 03-5513 9469
Email: kejuruteraan@mbsa.gov.my